Each document available electronically may be viewed by clicking on the document title.
All documents on this page are in Adobe Portable
Document Format (PDF). To view them we recommend that you use
the latest version of Acrobat® Adobe
Reader. Click
here to download it
| Mr
Henry Abraham MA MSc - Transport Policy |
|
| TFL/P/01/1 |
Transport
Policy; Volume 1 - Summary |
[61
KB] |
| TFL/P/01/2 |
Transport
Policy; Volume 2 - Main Text |
[178
KB] |
| TFL/P/01/3 |
Transport
Policy; Volume 3 - Appendices |
[8,157
KB] |
| TFL/P/01/4 |
Note
to Thames Gateway Public Inquiry; Replacement Versions of Appendices
1 and 7 of Henry Abraham’s Evidence |
[74
KB] |
| TFL/P/01/5 |
Note
making a correction to Henry Abrahams Evidence |
[25
KB] |
| TFL/P/01/6 |
Transport
Policy Proof December 2005 |
[290
KB] |
|
|
|
| Mr
George Kennedy MSc CEng MICE - Highway Engineering |
|
| TFL/P/02/1 |
Highway
Engineering; Volume 1 - Summary |
[60
KB] |
| TFL/P/02/2 |
Highway
Engineering; Volume 2 - Main Text |
[262
KB] |
| TFL/P/02/3 |
Highway
Engineering; Volume 3 - Figures |
[8,687
KB] |
| TFL/P/02/4 |
Highway
Engineering;Volume 3 - Figures Visible Mapping Base re INQ/8 3/1 |
[656
KB] |
| TFL/P/02/5 |
Supplementary
Proof - Barnham Drive Public Transport Loop Design Change Nov 2005 |
[305
KB] |
| TFL/P/02/6 |
Supplementary
Highway
Engineering Proof Dec 2005 |
[243
KB] |
|
|
|
| Mr
Stephen J Ellison CEng MICE MICH - Bridge Engineering and Cost
Estimates |
| TFL/P/03/1 |
Bridge
Engineering and Cost Estimates; Volume 1 - Summary |
[54
KB] |
| TFL/P/03/2 |
Bridge
Engineering and Cost Estimates; Volume 2 - Main Text |
[163
KB] |
| TFL/P/03/3 |
Bridge
Engineering and Cost Estimates; Volume 3 - Figures |
[6,563
KB] |
|
|
|
| Mr
Richard Smith BA MSc - Traffic, Tolling, Public Transport and
Appraisal |
| TFL/P/04/1 |
Traffic,
Tolling, Public Transport and Appraisal; Volume 1 - Summary |
[58
KB] |
| TFL/P/04/2 |
Traffic,
Tolling, Public Transport and Appraisal; Volume 2 - Main Text |
[311
KB] |
| TFL/P/04/3 |
Traffic,
Tolling, Public Transport and Appraisal; Volume 3 - Figures |
[8,800
KB] |
| TFL/P/04/4 |
Traffic,
Tolling, Public Transport and Appraisal; Volume 4 - Appendices |
[608
KB] |
| TFL/P/04/5 |
Traffic,
Tolling, Public Transport and Appraisal; Volume 5 - Tables |
[266
KB] |
| TFL/P/04/6 |
Forecast
Highway Impacts of Thames Gateway Bridge |
[273
KB] |
| TFL/P/04/6/1 |
Traffic,
Tolling, Public Transport & Appraisal Evidence |
[1,120
KB] |
| TFL/P/04/7 |
Figure
17 Location of High Traffic Changes & Potential Junction
Congestion (As Set Out in Tables 19 & 10) |
[81
KB] |
| TFL/P/04/8 |
Supplementary
Traffic
and Transport Proof December 2005 |
[110
KB] |
|
|
|
| Professor
Bridget Rosewell MA MPhil - Regeneration Implications |
|
| TFL/P/05/1 |
Regeneration
Implications of Thames Gateway Bridge; Volume 1 - Summary |
[53
KB] |
| TFL/P/05/2 |
Regeneration
Implications of Thames Gateway Bridge; Volume 2 - Main Text |
[241
KB] |
| TFL/P/05/3 |
Regeneration
Implications of Thames Gateway Bridge; Volume 3 - Appendices |
[4,315
KB] |
| TFL/P/05/4 |
Supplementary
Regeneration
Proof December 2005 |
[79
KB] |
|
|
|
| Mr
Stephen D Allen BA PhD - Funding |
|
| TFL/P/06/1 |
Funding;
Volume 1 - Summary |
[49
KB] |
| TFL/P/06/2 |
Funding;
Volume 2 - Main Text |
[67
KB] |
| TFL/P/06/3 |
Funding;
Volume 3 - Appendices |
[657
KB] |
| TFL/P/06/4 |
Supplementary
Funding
Proof December 2005 |
[41
KB] |
|
|
|
| Professor
Richard Burdett BA (Hons), MSc, Dip Arch, FRIBA - Design |
|
| TFL/P/07/1 |
Design;
Volume 1 - Summary |
[61
KB] |
| TFL/P/07/2 |
Design;
Volume 2 - Main Text |
[127
KB] |
| TFL/P/07/3 |
Design;
Volume 3 - Figures |
[1,511
KB] |
|
|
|
| Mr
Ralph O Cobham BC MSc - Landscape and Visual Issues |
|
| TFL/P/08/1 |
Landscape
and Visual Issues; Volume 1 - Summary |
[62
KB] |
| TFL/P/08/2 |
Landscape
and Visual Issues; Volume 2 - Main Text |
[178
KB] |
| TFL/P/08/3 |
Landscape
and Visual Issues; Volume 3 - Appendices |
[25,515
KB] |
|
|
|
| Mr
Michael C Clarke CEng MICE MIMM - Project Strategy and Programme |
| TFL/P/09/1 |
Project
Strategy and Programme; Volume 1 - Summary |
[47
KB] |
| TFL/P/09/2 |
Project
Strategy and Programme; Volume 2 - Main Text |
[115
KB] |
| TFL/P/09/3 |
Project
Strategy and Programme; Volume 3 - Appendices |
[1,191
KB] |
| TFL/P/09/4 |
Table
2: Outline of the ongoing programme key dates |
[54
KB] |
| TFL/P/09/5 |
Supplementary
Proof Michael C Clarke |
[41
KB] |
|
|
|
| Mr
Michael Adams MA, Dip TP, Dip Cons, MRTPI, MIHBC - Town Planning |
| TFL/P/10/1 |
Town
Planning; Volume 1 - Summary |
[74
KB] |
| TFL/P/10/2 |
Town
Planning; Volume 2 - Main Text |
[393
KB] |
| TFL/P/10/3 |
Town
Planning; Volume 3 - Figures |
[2,193
KB] |
| TFL/P/10/4 |
Town
Planning; Volume 4 - Appendices |
[2,965
KB] |
| TFL/P/10/5 |
Town
Planning; Volume 5 – Addendum |
[1,810
KB] |
| TFL/P/10/6 |
Town
Planning; Volume 5 – Appendix 12 |
[16
KB] |
|
|
|
| Professor
Duncan Laxen PhD MSc BSc - Air Quality |
|
| TFL/P/11/1 |
Air
Quality; Volume 1 - Summary |
[53
KB] |
| TFL/P/11/2 |
Air
Quality; Volume 2 - Main Text |
[164
KB] |
| TFL/P/11/3 |
Air
Quality; Volume 3 - Appendices |
[90
KB] |
| TFL/P/11/4 |
Air
Quality; Volume 4 - Figures |
[5,793
KB] |
| TFL/P/11/5 |
Air
Quality; Volume 5 – Note on Low Emission Zones |
[34
KB] |
| TFL/P/11/6 |
Supplementary
Air
Quality Proof December 2005 |
[171
KB] |
|
|
|
| Dr
Michael E Fillery BSc MSc PhD FIOA - Noise and Vibration Impact |
|
| TFL/P/12/1 |
Noise
and Vibration Impact; Volume 1 - Summary |
[56
KB] |
| TFL/P/12/2 |
Noise
and Vibration Impact; Volume 2 - Main Text |
[172
KB] |
| TFL/P/12/3 |
Noise
and Vibration Impact; Volume 3 - Appendices |
[2,531
KB] |
| TFL/P/12/4 |
Supplementary
Noise
Proof December 2005 |
[77
KB] |
|
|
|
| Dr
Jo C Hughes - Ecology |
|
| TFL/P/13/1 |
Ecology;
Volume 1 - Summary |
[49
KB] |
| TFL/P/13/2 |
Ecology;
Volume 2 - Main Text |
[186
KB] |
| TFL/P/13/3 |
Ecology;
Volume 3 - Figures |
[4,905
KB] |
|
|
|
| Mr
Adrian C Maher BSc MRICS - Compensation and Compulsory Purchase
Acquisition |
| TFL/P/14/1 |
Compensation
and Compulsory Purchase Issues; Volume 1 - Summary |
[63
KB] |
| TFL/P/14/2 |
Compensation
and Compulsory Purchase Issues; Volume 2 - Main Text |
[108
KB] |
| TFL/P/14/3 |
Compensation
and Compulsory Purchase Issues; Volume 3 - Figures |
[1,114
KB] |
| TFL/P/14/4 |
Fig
N1 Agreements with Freehold Owners |
[135
KB] |
|
|
|
| Mr
Chris A Swiderski BA - Deposit of Documents |
|
| TFL/P/15/1 |
Deposit
of Documents; Volume 2 - Main Text |
[89
KB] |
| TFL/P/15/2 |
Deposit
of Documents; Volume 3 - Appendices |
[113
KB] |
| TFL/15 |
Statement
of Case |
[1,212 KB] |
| TFL/16 |
Statement
of Case for Revised Worksite Compound |
[1,942 KB] |
| TFL/17 |
Statement
of Common Ground |
[152 KB] |
| TFL/18 |
Woolwich
Arsenal Supplementary Planning Application |
[263 KB] |
| TFL/19 |
London
Borough of Bexley UDP 2004
http://www.bexley.gov.uk/service/planning/udp_review.html |
|
| TFL/20 |
Growth
and Regeneration in the Thames Gateway Interregional Planning
Statement by the Thames Gateway Regional Planning Bodies
http://www.southeast-ra.gov.uk/our_work/planning/
area_studies/thames_gateway/thames_gateway.pdf |
|
| TFL/21 |
The
London Plan – DRAFT Sub Regional Development Framework East London |
[2,099 KB] |
| TFL/22 |
The
Draft Five Boroughs Legal Agreement |
[90 KB] |
| TFL/22A |
Boroughs
Agreement 21 Oct 2005 |
[1,444 KB] |
| TFL/22B |
5
Boroughs Agreement 14 Feb 06 |
[1,954 KB] |
| TFL/22C |
Signed
Four Boroughs Legal Agreement 19 April 2006 |
[3,273 KB] |
| TFL/22D |
Deed
of Undertaking by TFL to LB Bexley 19 April 2006 |
[517 KB] |
| TFL/23 |
Thames
gateway Bridge Upper Bound OS Co-ordinates of Permanent Works for
LCA/CAA Assessment TBTGRC/P2/TGB/323 |
[97 KB] |
| TFL/24 |
Planning
Conditions |
[111 KB] |
| TFL/24A |
Proposed
Planning Conditions (Revised 23 Sept 2005) |
[155 KB] |
| TFL/24B |
Response
to the Inspectors Premilinary Notes for the Proposed Roundtable
Session on Conditions (INQ/13 16/09.06) |
[51 KB] |
| TFL/24C |
CAP
680 Aerodrome Bird Control |
[787 KB] |
| TFL/24D |
Proposed
Planning Conditions (Revised 29th September 2005) |
[76 KB] |
| TFL/24E |
Inquiry Note Drawings Referred to in
TfL/24A & TfL/24D |
|
| TFL/24F |
Revised
Conditions A7 & D2 |
|
| TFL/24G |
Proposed
Planning Conditions Explanatory Note |
[24 KB] |
| TFL/24H |
Environment
Agency Letter re Planning Conditions |
[43 KB] |
| TFL/24I |
Email
from LTGDC re Planning Conditions |
[26 KB] |
| TFL/24J |
Email
dated 13 Dec 05 From LBG re Conditions |
[24 KB] |
| TFL/24K |
Letter
dated 24 Jan 06 from LBN re Conditions |
[53 KB] |
| TFL/24L |
Letter
dated 13 Dec 05 from PLA re Conditions |
[39 KB] |
| TFL/24M |
Revised
Planning Conditions 30 Nov 05 (Tracked) |
[100 KB] |
| TFL/24N |
Proposed
Planning Conditions North of the River |
[66 KB] |
| TFL/24O |
Proposed
Planning Conditions South of the River |
[64 KB] |
| TFL/24P |
LTGDC
Statutory Instrument 2005 No
http://www.opsi.gov.uk/si/si2005/20052721.htm |
|
| TFL/24Q |
Extract
of Map referred in 24P |
[283 KB] |
| TFL/24R |
Document
Not Issued |
|
| TFL/24S |
Proposed
Planing Conditions Temporary Construction Worksite (25th April 2006) |
[191 KB] |
| TFL/24T |
Proposed
Planning Conditions North of the River (25th April 2006) |
[382 KB] |
| TFL/24U |
Proposed
Planning Conditions South of the River (25th April 2006) |
[371 KB] |
| TFL/24V |
Email
from LB Greenwich regarding revised Planning Application Drawings |
[14 KB] |
| TFL/24X |
Planning
Conditions Drawings |
|
| TFL/24Y |
Proposed
Planning Conditions Explanatory Note 2 |
|
| TFL/24Z |
Table
of Drawing Revisions |
|
| TFL/24Z/1 |
Table
of Drawing Revisions |
[32 KB] |
| TFL/25 |
Environmental
Statement Non-Technical Summary |
[442 KB] |
| TFL/26 |
Environmental
Statement Non-Technical Summary: Addendum (March 2005) |
[311 KB] |
| TFL/27 |
A2012
GLA Road (Thames Gateway Bridge) Compulsory Purchase Order 2004 List
of Objector Undertakings and Agreements |
[59 KB] |
| TFL/27/1 |
Revised
copy of TFL/27 |
|
| TFL/28 |
British
Telecommunications PLCv Gloucester City Council |
[4,081 KB] |
| TFL/29 |
Bexley
LBC v SETR and others [2001] EWHC Admin 323 |
[1,658 KB] |
| TFL/30 |
R
v Secretary of State for Transport ex p de Rothschild [1989] 1 All
ER 933 |
[487 KB] |
| TFL/31 |
Procedure
Notes |
[29 KB] |
| TFL/32 |
Scheme
Plans |
[4,721 KB] |
| TFL/33 |
Transport
for London Opening Statement |
[88 KB] |
| TFL/34 |
Street
Map of East London |
|
| TFL/34A |
Map
of East London Additional Areas |
|
| TFL/35 |
Map |
[330 KB] |
| TFL/36 |
Map |
[325 KB] |
| TFL/37 |
Mayor
Answers to London – Silvertown Crossing (GLA Website 08/06/2005) |
[37 KB] |
| TFL/38 |
Creating
Sustainable Communities: Greening the Gateway Implementation Plan (ODPM
and DEFRA, 2005)
http://www.communities.gov.uk/documents/
thamesgateway/pdf/146685 |
|
| TFL/39 |
Changes
to A2012 GLA Road CPO Sheet 6 SK-CH-90 |
[198 KB] |
| TFL/40 |
The
A2012 GLA Road (Thames Gateway Bridge) Compulsory Purchase Order
2004 Sheet 6 of 7 |
[159 KB] |
| TFL/41 |
The
A2012 GLA Road (Thames Gateway Bridge) (Side Roads) Order 2004 Site
Plan 7 |
[76 KB] |
| TFL/42 |
Barnham
Drive/Grasshaven Way Junction Configuration |
[105 KB] |
| TFL/43 |
Extract
from Tfl Investment Programme 2005/06 – 2009/10 |
|