This page is maintained by Persona Associates

Back to Persona Homepage

                                            

Humberhead Levels Windfarms Inquiry Home

Inquiry News (updated 28 February 2008)

Inquiry Documents (Final issue of Docs List: 15/06/07)

Inquiry Library

Inquiry Programme

Inquiry Venue

Procedures

Pre-inquiry Meeting

Written Representations

Who's Who

Related Links
                                       

Last Modified: 07 March 2008

Humberhead Levels Windfarms Public Inquiry
(Keadby and Tween Bridge)

Welcome to the Humberhead Levels Windfarms
(Keadby and Tween Bridge) 
Public Inquiry website

This website contains as much information and documentation as possible about the joint Public Inquiry and has been updated regularly and maintained throughout the period of the  Inquiry.  Please use the links to the left of this page to access other information.

PLEASE NOTE: Documents available on this site are in Adobe Portable Document Format (PDF).  To access the PDF files you will need Acrobat® Adobe Reader 7 (or later). This may be downloaded free of charge by clicking the link below.  If you have any problems, please contact the Programme Officer at the Inquiry Secretariat.

DECISIONS ANNOUNCED

Click appropriate link below for details

Keadby Decision Letter                                                      Tween Bridge Decision Letter

Keadby Consent                                                                  Tween Bridge Consent

Keadby Consent Plan                                                          Tween Bridge Consent Plans

Humberhead Levels Inspector's Report

-------------------------------------------------------------------------------------------------------

INQUIRY CLOSED FRIDAY 15th JUNE 2007 AT 6.30pm

CLICK HERE FOR CLOSING STATEMENTS/SUBMISSIONS

AND HERE FOR LATEST NEWS

STATEMENTS OF COMMON GROUND

Keadby - RES Developments Limited and North Lincolnshire Council

Tween Bridge - E.ON Renewables UK Ltd, Doncaster Metropolitan Borough Council and North Lincolnshire Council

See also QUICK LINKS below

The Secretary of State for Trade and Industry announced on 27 July 2006 that a joint Public Inquiry was to be held into two windfarm applications:- 

  1. by Renewable Energy System Limited for consent to construct and operate an 85 MW wind turbine generating station at Keadby in North Lincolnshire (and lying to the east of Crowle, North Lincolnshire), and  

  2. by E.ON UK Renewables Limited for consent to construct and operate a 66 MW wind turbine generating station at Tween Bridge at Thorne, Doncaster, South Yorkshire (and lying to the west of Crowle, North Lincolnshire).

A copy of the Notice of Inquiry may be viewed here.

A copy of the Rule 5 Statement of Matters may be viewed here.

Mr Keith Smith BA(Econ), DipTP, DPA, FRTPI, ACIS was appointed as the Inspector to conduct the Public Inquiry, which opened at 10.30am on Tuesday 9 January 2007 in the Vikings Hotel, Western Road, Goole, DN14 6RG.

A Pre-Inquiry Meeting (PIM) was held on Monday 25 September 2006 at the Vikings Hotel, Western Road, Goole, DN14 6RG.  A copy of the Agenda may be viewed from the Pre-Inquiry Meeting page on this website, where links to the Note of the Meeting may also found.

Please also refer to the Inquiry News page for up-to-date information.

QUICK LINKS

STATEMENTS OF CASE

Keadby - Further Environmental Information

Programming Registration Form

(See also General Notes on Inquiry Programme page)

The Acrobat® Reader allows anyone to view, navigate, and print documents in the Adobe Portable Document Format (PDF). It also allows anyone to perform full-text searches of PDF documents.  Click here for free download.

You are visitor Hit Counter since 10th August 2007