A14 Ellington to Fen Ditton Improvement
Welcome to the A14 Ellington to Fen Ditton Improvement
Public Inquiry Website
This website contains information relevant to the Public Inquiry.
Please use the links to the left of this page to access other information.
INQUIRY POSTPONED
See the letter from
the Government Office For the East of England [28 KB]
The Public Inquiry into the Highway Agency's proposals for improving
the A14 Trunk Road between Ellington and Fen Ditton in Cambridgeshire will
open on Tuesday 20th July 2010 at St. Ives Business Park, Parsons Green,
St. Ives, PE27 4WY. See formal Public
Notice of Inquiry [17 KB]
A Pre-Inquiry Meeting
to plan and discuss procedural and timetable matters for the Inquiry took
place on Monday 24th May
2010 at the Burgess Civic Hall in St. Ives.
The Notes of that Meeting have now been
published.
CLICK HERE TO VIEW
THE NOTES OF THE PRE-INQUIRY MEETING [266 KB]
The following documents are available to be viewed from this site:
Outline Statement of Case by
the Highways Agency [724 KB]
The Draft Order Documents (see
this page)
A copy of a Scheme Plan [537
KB]
a copy of the draft Orders Explanatory Statement
[41 KB]
A copy of the Non Technical Summary
(NTS) of the Environmental
Statement [2,718 KB]
A copy of the NTS Schematic map
only [1,707 KB]
Further scheme documents, including the full Environmental Statement, are available from the Highways
Agency A14 Publications page.
The A14 proposals were published on 30th September 2009 in Draft Orders
under the Highways Act 1980, together with an Environmental Statement. The draft Orders (available here)
provide for:-
A new trunk road running between Ellington and Fen Drayton (two lane dual
carriageways between Ellington and the A1 south-west of Huntingdon and
three lane dual carriageways between the A1 and Fen Drayton, south of Huntingdon and Godmanchester) and
the widening of the existing A14 between Fen Drayton and Fen Ditton to three lanes in each direction.
New and improved junctions and interchanges, including ones at
Ellington, Brampton, Fen Drayton and Girton, which includes a new motorway
connecting road to the M11 Motorway (Junction 14).
Alterations to existing highways and private accesses affected by the provision of the
new and improved trunk road, including their stopping up and improvement
and the construction of new highways (including local access roads between
Fen Drayton and the M11 (Junction 14) and of new accesses. It is proposed
to remove the Huntingdon Railway Viaduct to provide opportunities for
Huntingdon's town centre regeneration.
The de-trunking of the bypassed sections of the existing A14.
The compulsory acquisition of land which would be needed for the scheme
including that for the diversion of, and other works to, watercourses and
to mitigate any adverse effects of the scheme.
You can change the colours on this page (and any page for this Inquiry Website) by using the drop-down list at the top of the page (if you do not have cookies enabled, this will not work)*. You can also change the text size by clicking the above links on any page of this Inquiry Website. These functions will not appear if you have disabled
JavaScript.
| PLEASE NOTE: Documents referred to on this site will normally be in Adobe Portable Document Format (PDF). |
| The Acrobat® Reader allows anyone to view, navigate, and print documents in the Adobe Portable Document Format (PDF). It also allows anyone to perform full-text searches of PDF documents. |
 |
| Any documents not in Adobe Portable Document Format (PDF) will be clearly shown. |
You are visitor since 26th January
2010
* The code for this can be found here: http://www.edochan.com/programming/layout.htm
|